Paladon Systems

Iraqi Project Win

GE Oil & Gas places order for the Aumara Depot Pressure Reduction project
 

To be fitted to 24” Class 600 globe valves, Paladon Systems will be supplying 3 self-contained electro-hydraulic valve positioning systems. These EExd certified systems will provide precise valve positioning with an accuracy of ±0.5% as well as a fail-safe position on loss of either the 380V electrical supply or 4-20mA command signal.

Paladon Systems Sales Engineer, Wojtek Nowakowski, “We have previously worked closely with GE Oil & Gas on several large power generation projects and are delighted that our successful completion of these technically demanding projects has helped secure this latest order.”

Find out more about GE Oil & Gas and self-contained electro-hydraulic systems.

Back to top