Paladon Systems

Gorgon CO2 Project in Barrow Island LNG Plant, Australia

Paladon Systems is pleased to announce that has just completed the second batch of Electro Hydraulic Linear Spring Return Actuators, Model HYL-44,45-56-SRCF6-173(353)-RS3-rod40 to be part of Gorgon CO2 Project in Barrow Island LNG Plant, Australia for Chevron Australia Pty Ltd.

These Actuators, installed on 6”2500 Valves have as main components of Control System a Position Transducer, a Valve Control Positioner and a Solenoid Valve.

Back to top